Delivery brief builder.

Put what a supplier and a driver need for one delivery into a short brief you can copy or print. It uses roles and a site reference instead of names, phone numbers or addresses.

A brief is information prepared for one delivery. It is not a booking or an accepted load.

What goes into a brief.

Site and date
A site reference (a nickname is enough) and the delivery date. Both are required.
Task and consequence
The task the materials support, and what happens if one item is missing.
Arrival window
The earliest acceptable arrival and the latest usable arrival.
Receiving
The receiver’s role, and whether a contact method has been agreed in advance.
Site access and unloading
Where the truck enters and stops, and how the load comes off.
Materials ready
Each item with its quantity, supplier and supplier order reference, whether it is already ordered, and when it will be ready for pickup.

The printed copy has blank lines for the job address and the receiver’s name, to fill in by hand; this page does not ask for them.

How a brief is checked.

  • A part is ready when every field in it is filled in.
  • An empty field, a value in square brackets or a filler such as “TBD” counts as not filled in.
  • The site reference and the delivery date are required before a brief can be complete.
  • The latest usable arrival must be later than the earliest acceptable arrival.
  • Receiving is ready when the receiver’s role is given and a contact method has been agreed.
  • Materials are ready when every item listed has its material, quantity, supplier and supplier order reference, is already ordered and has a time it will be ready for pickup.

Uses your inputs. Simplified rules for illustration, not BuildQuick’s dispatch logic. Nothing you enter is stored or sent; you don’t need to enter names, phone numbers or addresses.

Build your brief.

Site and date

The name your team uses for the job. Not its address.

Task and consequence

The work waiting for this delivery.

What stops, and who waits, if one item does not arrive.

Arrival window

Earliest acceptable arrival
Latest usable arrival

Receiving

A role, such as site lead. Not a name.

Contact method agreed

Has the receiver agreed how the driver reaches them on arrival? Keep the details themselves off this page.

Site access and unloading

Where the truck enters and stops, and any limit on height, weight or turning.

Who or what takes the load off: a forklift, a crane booking or hand unloading.

Materials ready

First item

How many, in the unit the supplier uses.

Order status

When the supplier says the order will be ready, as a 24-hour time.

Second item

How many, in the unit the supplier uses.

Order status

When the supplier says the order will be ready, as a 24-hour time.

Third item

How many, in the unit the supplier uses.

Order status

When the supplier says the order will be ready, as a 24-hour time.

Brief readinessNot calculated yet

Enter details, or try the example values, to see which parts of the brief are ready.

Assumptions and sources

This tool uses only the figures you enter.